2250239
CONSTRUCTION OF NEW 27M MULTI-USER TELECOMMUNICATIONS SUPPORT STRUCTURE CARRYING 10 NO. ANTENNAS AND ASSOCIATE REMOTE RADIO UNITS, 5 NO. COMMUNICTION DISHES, 3 NO. LIGHTNING FINIALS AND 10 NO. OUTDOOR CABINETS ALL ENCLOSED WITHIN A SECURITY COMPOUND WITH A 2.4M HIGH PALISADE FENCE WITH 4M ACCESS GATE. SITE ACCESS AND SITE WORKS TO INCLUDE CULVERTING IN PART OF THE EXISTING WATERCOURSE.
Core Refusal Reason
The Planning Authority initially refused permission based on the demolition of structures attendant to a protected structure, inappropriate design typologies, flood risk concerns, and road safety. However, the Board's Inspector recommended granting permission, concluding that the demolition was justified as 'exceptional circumstances' to facilitate site regeneration and that all technical issues regarding flooding and traffic had been adequately mitigated.
Decision Maker's Conclusion
- The demolition of the ruinous coach house is justified under 'exceptional circumstances' as it is essential to provide safe vehicular access and facilitates the comprehensive restoration and community reuse of the primary protected structure, Athenry House.
- The proposed design and layout represent a high-quality, contemporary urban expansion that successfully integrates with the medieval town walls and the Architectural Conservation Area while providing a sustainable mix of residential and commercial uses.
- Technical concerns regarding flood risk, traffic safety, and car parking shortfalls have been resolved through revised site layouts, detailed hydraulic modelling, and the application of flexible parking standards appropriate for a town-centre location.