SI202201
a 10 year permission for the construction of an electrical substation and associated 110kV and MV ancillary infrastructure required to connect ground mounted soclar PV generation to the electricity transmission system; energy storage modules; lightning protection masts; Perimeter security fencing; Access tracks; undergorund cabling; temporary construction compound; tree plating; drainage infrastructure and all associated ancillary site development works
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.