3509/22
The development consists of: the demolition of existing 5 storey, 4,105 sq.m. structure on site (formerly known as Zurich House) and the construction of an 8 storey over basement office building of c. 19,154 sq.m. The building will contain a double height entrance reception area at ground floor and set back upper floors and terraces. The basement access/egress is via ramp from Ballsbridge Park. The basement will contain 44 no. car parking spaces, 3 no. of these are accessible, 276 no. bicycle parking spaces, 6 no. cargo/non-standard bike spaces and 22 no. scooter spaces. Changing rooms/showers, gym, bin stores, plant and attenuation tank are also contained within the basement. Green roof, solar panels, ESB substation, landscaping works and a new service access road onto Ballsbridge Park at the north of the site are proposed to be incorporated into the scheme.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.