SD22A/0051

Land recontouring/infilling works on c 16,000sq.m of a folio size of c 2.4 ha (allowing buffers); the volume of material to be placed on the site is c 35,000sq.m with an average fill level of c 3.5m above existing - the material is clean, inert soil and stone from the Saggart Water Reservoir construction site located directly adjacent to the north of the proposed infill site; a small section of hedgerow (6m wide) will be required to be removed between Saggart Water Reservoir construction site and the proposed infill site to allow access for lorries and infill equipment onto the proposed infill site.

Granted