(1) CONSTRUCTION OF A FIRST FLOOR EXTENSION TO THE SIDE ELEVATION (2) RENOVATION AND ALTERATIONS TO THE EXISTING GROUND FLOOR LAYOUT (3) ADDITION OF A FLAT ROOF CONTEMPORARY EXTENSION TO THE REAR ELEVATION (4) ALL ASSOCIATED ELEVATIONAL CHANGES AND ALL ASSOCIATED SITE WORKS